The framing was completed on Saturday and today the doors and windows were installed.
A few odds and ends need to be completed, but the framing is complete, with the exception of one window that was ordered last week – the original window would not fit in the space designed, so we went from a double hung to a casement. Anyone need an Anderson 2856 window?
As the result of a a few wall placement adjustments, we will need to swap a few of the vanities – but everyting will work in one location or another.
On Saturday the HVAC contractor came on site to measure for the duct work. It will take a week or so to fabricate. In the meantime, the cabinetmaker will stop by to take measurements so that the cabinets will fit and the plumber will complete the drain lines. Additionally, roofing will start followed by siding, then the decks.